Sign In | Join Free | My infospaceinc.com
China Jinhongtong Group Co., Ltd. logo
Jinhongtong Group Co., Ltd.
Precision Steel, Win-Win Future.
Verified Supplier

1 Years

Home > Steel Warehouse Building >

Prefabricated Warehouse Steel Structure Building Framework Factory Metal Work Plant Factory

Jinhongtong Group Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Prefabricated Warehouse Steel Structure Building Framework Factory Metal Work Plant Factory

  • 1
  • 2
  • 3

Brand Name : JinHongTong

Certification : CE (EN 1090),ISO 9001 / 14001 / 45001,AISC Standard,SABER / SASO / SABS,EN 10204 3.1 Material Certificate,ISO 3834 Welding Quality System

Place of Origin : China

MOQ : 100 ㎡

Price : 29.9

Payment Terms : L/C,D/A,D/P,T/T,Western Union

Supply Ability : Annual production capacity: 20,000 ㎡ - 30,000 ㎡ of steel structure buildings.

Delivery Time : 30 work days

Packaging Details : Waterproof plastic film + steel strip bundling + wooden pallets.Seaworthy export packing.

Maintenance : Low maintenance requirements

Rooftype : Insulated metal roof panels

Usage : Storage, manufacturing, distribution

Walltype : Steel wall panels with insulation

Material : High-quality steel

Foundation : Concrete slab or pier foundation

Customizationoptions : Doors, windows, ventilation, and interior layout

Productname : Steel Warehouse Building

Warranty : Typically 10-20 years depending on manufacturer

Structuretype : Pre-engineered steel frame

Dimensions : Customizable length, width, and height

Durability : Corrosion-resistant with protective coating

Fireresistance : Fire-retardant materials used

Loadcapacity : Designed to withstand heavy loads

Installationtime : Quick assembly with prefabricated components

Contact Now

Our steel structure school buildings adopt high-strength heavy steel frame system, featuring stable structure, strong seismic performance and high safety coefficient. Integrating scientific daylighting, ventilation and thermal insulation design, they create a bright, quiet and comfortable learning environment for students and teachers.

Factory prefabrication and fast on-site installation greatly shorten construction period and reduce overall project cost. With professional fireproof, anti-corrosion and environmental protection treatment, the buildings are eco-friendly, durable and low in later maintenance.

Suitable for kindergartens, primary schools, middle schools and campus supporting buildings, we provide fully customized layout, appearance and structural solutions to meet local building codes and educational construction standards.

Product Name

Prefabricated Warehouse Steel Structure Building Framework Factory Steel Structure Warehouse Metal Work Plant Factory

Main steel frame

steel columns

Q235, Q355 welded h-shaped steel

steel beam

Q235, Q355 welded h-shaped steel

Secondary Frame

Pur strip

Q235 C and Z purlins

Knee pads

Q235 angle steel

Tie rod

Q235 round steel pipe

Bracket

Q235 round rod

Vertical and horizontal supports

Q235 angle steel, round bar or steel pipe

Maintain system

Roof panels

EPS sandwich panel/glass fiber sandwich panel/ Rock wool sandwich panel/polyurethane sandwich panel/steel plate

Wall panel

Sandwich panel/corrugated steel plate

Appendix

window

Aluminum alloy windows/PVC windows/sandwich panel windows

Door

Sliding sandwich panel door/rolling metal door

awning

PVC

Live load on roof

At 120kg/m2 (surrounded by colored steel plates)

Wind resistance level

12 levels

Earthquake resistant

8 levels

Structure usage

up to 50 years

Organizing options

Wide variety of colors and textures available

Certificate

ISO 9001, CE, SGS, AWS D1.1

welding standard Service

Design + Fabrication + Installation + 10-year warranty

Paint options

Three layers of anti-rust paint, which are epoxy zinc-rich primer, epoxy micaceous iron intermediate paint, and polyurethane

topcoat//Or galvanized

The facility operates 170 sets of advanced fabrication equipment, including large hydraulic press brakes, CNC drilling machines, China's largest shot blasting units, and ultrasonic flaw detectors, ensuring precision manufacturing standards.

Main Materials

Prefabricated Warehouse Steel Structure Building Framework Factory Metal Work Plant Factory

Project Display

Prefabricated Warehouse Steel Structure Building Framework Factory Metal Work Plant Factory

Packaging&Shipping

Prefabricated Warehouse Steel Structure Building Framework Factory Metal Work Plant Factory

In order to save the quality of the Prefabricated Barns Prefab Steel Frame House / Large Scale Farm Steel Structure Warehouse, we provide standard sea container loading package. We generally use 40HOT for loading and uploading.

The processing of our heavy steel structure members strictly follows international standards such as AISC 360, Eurocode 3 and EN 1090, ensuring high quality and structural stability for overseas projects.
Then, strict raw material inspection is carried out for the incoming steel plates and sections, including material certificate verification, size measurement and appearance inspection.
Next, lofting, marking and cutting are performed by numerical control equipment to guarantee precise cutting dimensions.
After that, straightening and correction (thermal or mechanical) are conducted to ensure the flatness of the components.
Drilling and punching processes are then carried out to meet the assembly requirements, followed by the assembly and fitting-up of main components such as H-beams, columns, beams and supports.
Professional welding (submerged arc welding, gas shielded welding) is implemented to ensure the firmness of the joints, and subsequent welding inspection (visual inspection and UT/MT non-destructive testing) is carried out to ensure welding quality.
Secondary straightening and grinding are performed to correct deformation and remove burrs, and then shot blasting is conducted to reach Sa2.5 derusting grade, which enhances the adhesion of the coating.
Finally, each component is marked clearly, packed properly and delivered from the factory, ensuring safe transportation and smooth on-site installation for our customers.


Product Tags:

Prefabricated steel structure building

      

Fire retardant steel structure building

      

Corrosion resistant steel warehouse construction

      
Quality Prefabricated Warehouse Steel Structure Building Framework Factory Metal Work Plant Factory for sale

Prefabricated Warehouse Steel Structure Building Framework Factory Metal Work Plant Factory Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinhongtong Group Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)